Thumb Rules for Civil Engineers and Basic Knowledge .

The volume of concrete required = 0.038 m3/square feet area. Example:-If Plan Area = 40 x 20 = 800 Sq. m. So, for the plan area of 800 Sq. m. the area the total volume of concrete required = 800 x 0.038m3 = 30.4m3. Thumb rule for Steel quantity required for Slab, Beams, Footings & Columns:

Chat With Sales

What is the quantity of cement required for 100 sq.m .

What is the quantity of cement required for 100 sq.ft. tiling work? What is the volume of concrete poured in a trench 9m long, 600mm wide and 1 m deep.The thickness of concrete is 460mm? Max water required to be added per 50 kg bag of cement of M15 grade of concrete is?

Chat With Sales

Reinforced concrete slab systems on steel decks

Reinforced concrete slab systems on steel decks Decking can serve as form, shoring and finished surface . 2 400 330 278 236 204 178 156 138 123 111 100 . The requirements for shoring are based on the ability of the decking to

Chat With Sales

How to Calculate the Number of Cement Blocks for a .

For example, a standard cement block measures 16 x 8 inches, so it covers 0.89 square feet — (16 x 8) / 144 = 0.89. Step 5 Calculate the number of blocks required by substituting the area to be built and the size of the block in this equation: total area of walls / area of a block = number of blocks required.

Chat With Sales

CONCRETE GRADE: M5 = 1:4:8 M10= 1:3:6 M15= 1:2:4 M20= 1:1 .

09. Cement Paint/100 Sft 2.00 Kg 10. White Cement/100 Sft 2.00 Kg 11. Janathacem/100 Sft 1.50 Kg 12. Enamel Paint/100 Sft - 2 Coats 1.25 Litre 13. Wall Putty/100 Sft 10.00 Kg 14. Plaster of Paris/100 Sft 25.00 Kg 15. Distember/100 Sft 2.00 Kg 16. Cement Primer 0.60 Litre 0.40 Litre 17. Weathering Course Lime 12.50 Kg Brick bats 32.00 Kg 18.

Chat With Sales

steel required for 100 sq ft roof Archives - Civiconcepts

Civiconcepts - steel required for 100 sq ft roof

Chat With Sales

How we calculate the material requirement for 100 sq.ft .

Jun 25, 2019 · Procedure for calculating material requirement for 100 sq. ft. area wall. As you have not given any thickness for wall ? & Grade of Concrete ? in the Question . So I am considering it as 150 mm thick wall of M15 grade. If this is a Retaining wall .

Chat With Sales

Important Thumb Rules in Civil Engineering

Thumb rule for concrete work. The quantity ingredient material for concrete will be vary based on the mix ratio and the concrete volume 0.04 cum per sft for the plinth area. Example. If the Plinth area will be 100 Sft (10 x 10) So now the approximate required concrete volume for the building is 100 .

Chat With Sales

Calculators | HeidelbergCement India Limited

Estimate of Quantity calculation for slab work .

Chat With Sales

How to Calculate Cement, Sand Quantity for Plastering .

In this post, we are going to explain you, How to Calculate Cement, Sand Quantity for Plastering? Please note, before using the calculator embedded in this post understand the plastering cement mortar calculation concept. Note: For a better view, please read this post in landscape view if .

Chat With Sales

How to Calculate Cement, Sand Quantity for Plastering .

In this post, we are going to explain you, How to Calculate Cement, Sand Quantity for Plastering? Please note, before using the calculator embedded in this post understand the plastering cement mortar calculation concept. Note: For a better view, please read this post in landscape view if .

Chat With Sales

How to Calculate Quantities of Cement, Sand and Aggregate .

In the step 3 of "How To Calculate Quantities Of Cement, Sand And Aggregate For Nominal Concrete Mix (1:2:4)" you have calculated that: 01 cum of concrete will require Cement required = 1/0.167 = 5.98 Bags ~ 6 Bags Sand required = 115/0.167 = 688 Kgs or 14.98 cft Aggregate required = 209/0.167 = 1251 kgs or 29.96 cft

Chat With Sales

Quantity Of Cement, Sand, & Aggregates For 1000 sq ft Slab

Quantity Of Cement, Sand, & Aggregates For 1000 sq ft Slab? To calculate the quantity of cement, sand, and aggregates required for a flat slab first we need to calculate the volume. Area of flat slab = 1000 sq.ft =93 sq. m. The minimum thickness provided for slab is 150mm .( According to IS 456) [.]

Chat With Sales

Unit Weight of Materials Used at Construction Site

Following table shows unit weight of materials used at construction site. Please note this is for reference purpose only and may vary from place and type of material.

Chat With Sales

2020 Concrete Slab Costs | Cement Slab Cost | Cement Cost .

Cement tends to be sold by the cubic yard, which covers 27 square feet of ground. Tools Needed To DIY. Few projects need as many tools and materials for a DIY cement project. While all tools and materials below are not necessary, purchasing all will certainly make your life easier as you conduct almost any concrete or masonry project .

Chat With Sales

Concrete slab load limits.

Mar 15, 2009 · Not sure this helps, but way back when I was renting warehouse space there was a building code or something that said not to exceed ( I think) 100# per sq ft. Now this proly has more to do with ocupency code than actual concrete load.

Chat With Sales

Concrete Slab Cost Calculator - (2020) With Installation .

The Concrete Slabs estimator will provide you with up to date pricing for your area. Simply enter your zip code and the square footage, next click update and you will see a breakdown on what it should cost to have Concrete Slabs installed at your home. Example: a 10 x 10 area = 100 square feet.

Chat With Sales

How to Calculate the Quantity of shuttering for slabs .

Oct 22, 2017 · The quantity of shuttering calculation is very easy and simple with the help of thumb rules. The area of the shuttering is measured in square feet on in square meter depending upon the unit type. Basically shuttering is a temporary structure in the building construction because the shuttering will remove after concrete gets their desire strength.

Chat With Sales

Quantity Of Cement & Sand Required For 100 Sq.ft .

Nov 26, 2018 · Quantity Of Cement & Sand Required For 100 Sq.ft Plastering Work: Plastering is one of the most important work needs to be done to protect the surface of wall or roof ceiling. In this article I will discuss quantity of cement and sand required for 100 sq.ft .

Chat With Sales

How much steel is required in 1 sq ft of 6 inch slab - Answers

Apr 17, 2013 · How much steel is required in 1 sq ft of 6 inch slab . of steel is 7850 kg/ cum so 0.007*7850=54.95 say 55 kg per cum so steel required to reinforce 1 cum concrete for slab is approximately 55 .

Chat With Sales

Calculate Rebar Spacing, Layout and Weight in a Concrete .

Please help promote this free service - Tell a Friend about this site! Create PDF to print diagrams on this page. Help & Settings Printing Help (new window) Copy all diagrams on this page to bottom of page - Make multiple copies to Print or Compare.

Chat With Sales

How to Calculate Materials for 5 Inches Thick Brickwork .

So, the required numbers of bricks for 100 square feet brickwork is 500. Calculating Cement And Sand Quantity For 5 Inches Thick Brick Wall. Cement and sand are used to make mortar. So, for calculating cement and sand, you first need to calculate the required mortar volume for your estimated brickwork. So, How can we calculate mortar for brickwork?

Chat With Sales

60x40 Site Material Construction Cost | 2400 Sq ft House .

Know how much does it cost to build a 2400 sq ft house. And also learn how many bags of cement, steel and bricks are required for the construction.

Chat With Sales

Steel reinforcing in concrete - BuildEazy

Oct 05, 2017 · Sometimes steel reinforcing in concrete is put there to strengthen it, help hold the concrete together and limit cracking. In many cases, bigger concrete jobs that require reinforcing steel usually also require a building permit of some kind, in which case the reinforcing steel requirements will be documented on the plans.

Chat With Sales

How to Calculate the Quantity of shuttering for slabs .

Oct 22, 2017 · The quantity of shuttering calculation is very easy and simple with the help of thumb rules. The area of the shuttering is measured in square feet on in square meter depending upon the unit type. Basically shuttering is a temporary structure in the building construction because the shuttering will remove after concrete gets their desire strength.

Chat With Sales

Concrete Slab Calculator – Estimate The Amount Of Concrete .

Concrete Footing Calculator helps homeowners and contractors estimate the amount of pre-mixed concrete needed for footings, slabs and walls. Enter the dimensions of your project, and you will get results in cubic yards, as well as the number of concrete mix bags needed for the job.

Chat With Sales

Unit Weight of Materials Used at Construction Site

Following table shows unit weight of materials used at construction site. Please note this is for reference purpose only and may vary from place and type of material.

Chat With Sales

What is the quantity of cement required for 100 sq.ft .

What if there are more qualified people but whose ages are not within your required bracket? What is the quantity of cement required for 100 sq.m cement concrete (1:2:4) 4 cm thick floor? Is middle east region Retail stores and volume sellers profiled with the skills of managing efficiently inventories and cost per sq ft ?

Chat With Sales

Important Thumb Rules in Civil Engineering

Thumb rule for concrete work. The quantity ingredient material for concrete will be vary based on the mix ratio and the concrete volume 0.04 cum per sft for the plinth area. Example. If the Plinth area will be 100 Sft (10 x 10) So now the approximate required concrete volume for the building is 100 .

Chat With Sales

Concrete - Volume Estimate - Engineering ToolBox

Estimate required concrete volume per sq. ft. of slab Engineering ToolBox - Resources, Tools and Basic Information for Engineering and Design of Technical Applications! - the most efficient way to navigate the Engineering ToolBox!